SUWECO

Sunwest Water and Electric Company, Inc.

DOE Contract Signing

DOE Secretary Angelo Reyes and SUWECO Chairman Elizaldy S. Co, on center, flanked by DOE Director Mario Marasigan, DOE Undersecretary Ramon G. Santos (first and second from the left), FICELCO Board Director Fidelito Soledad, SUWECO President Jose Silvestre Natividad (second and first from the right) during the signing of the operating contract for Solong, Hitoma 1 and Hitoma 2 Mini-Hydro Projects in Catanduanes. June 17, 2008.

DOE Secretary Angelo Reyes and Suweco Chairman Elizaldy S. Co during the signing of the operating contract of three (3) mini-hydro projects in Catanduanes at the PNOC building on July 17, 2008.
GROUND BREAKING CEREMONIES for 2.3 MW Solong Mini-Hydro Power Plant Project in San Miguel, Catanduanes. Sunwest Water and Electric Company CEO Elizaldy S. Co, Catanduanes Governor Joseph Cua, DOE Secretary Angelo T. Reyes, Mayor Edna Vernal of San Miguel, claps and cheers during the laying of the capsule. July 29, 2008.

8 MW Villasiga Mini-Hydro Plant in Antique MOA signing; (from left) Jaro Archbishop Angel Lagdameo, DOE Secretary Angelo T. Reyes, Suweco Chairman Elizaldy S. Co and Antique Governor Salvacion Perez signs the operating contract on June 5, 2008.

DOE Secretary Angelo T. Reyes and Suweco President Jose Silvestre Natividad, DOE Director Mario Marasigan, and Suweco COO Robert C. Uy during the signing of the 18 mini-hydro project contracts: Solong, Hitoma 1, Villasiga, Guiamon San Ramon, Dalanas, Tibiao, Vera, Palali, Cumagingking, Dummon River 1 & 2, Pinacanauan River, Main Aklan River, Aklan River Tributary (Lower, Middle and Upper), Kapipian River and Davildavilan River at the DOE Building. February 1, 2010.

8 MW Villasiga Hydroelectric Power Project

Access Road Completed

Completed construction of Headwall of RCPC

Road Crossing Drainage: Excavation, Installation of RCPC and Construction of Headwall

Stockpiling & crushing of head-sized rocks at Sitio Sadsadan stockyard

Geotechnical Investigation: Ground resistivity investigation of Tunnel B traversing line

Quarry Operation: Stockpiling, loading and hauling of aggregates

Earthworks: Clearing of piloted access road from powerhouse location going to weir

Preparation of helipad at sitio Ybangan

Installation of perimeter fence for Explosives Storage Magazine at Sitio Sadsadan

Temfacils: Painting of staffhouse and construction of extension facility for monitoring personnel